Wembley Stadium
Twice a year Geovision performs deformation measurements on the roof and the characteristic arch of the stadium. In this way any problems are detected [...]
Twice a year Geovision performs deformation measurements on the roof and the characteristic arch of the stadium. In this way any problems are detected [...]
A 135m high Ferris wheel in the heart of London, one of England's most spectacular attractions. Geovisie provided accurate measurement work during the installation [...]
A £3 million project to build a tide gauge in Sutton Bridge will “significantly improve” flood alerts in the area, environment [...]
The Malampaya gas-condensate field, located offshore at Palawan in the Philippines, supplies gas to three power stations on Luzon Island. The Malampaya Phase 3 [...]
Immersion was a success! On August 29th, we floated the aqueduct structure out of the building dock, transported it and immersed the concrete element on [...]
In the night of 16 March at about 04:00 LT Caisson North at the Izmit Bridge Project reached “touch down” within the strict tolerances of [...]
Monitoring of bridge installation was successfully executed by Geovisie!
In Coatzacoalcos, Mexico we supplied Positioning and surveying support during the entire project: placing the gravel bed and the immersion of the 5 tunnel [...]
14-6-2019: More information about this project will be published later on the future
The installation of a range-range positioning system due to interferance of the GPS signal in this location. Special care was taken in selection of [...]