The Malampaya gas-condensate field, located offshore at Palawan in the Philippines, supplies gas to three power stations on Luzon Island. The Malampaya Phase 3 (MP3) Project comprises the installation of a new Depletion Compression Platform (DCP) complete with a bridge linked to the existing Shallow Water Platform (SWP). Boskalis International B.V. – Philippine Branch has been awarded a Contract by Shell Philippines Exploration B.V. including the following work packages:
Seabed Preparation Works for the MP3
Transport and Installation of the Depletion Compression Platform (DCP) and Bridge.
Geovisie work scope
Geometry surveys
Calibrations
Position verification
positioning DCP platform from existing SWP platform using robotic totalstations.
On 13 of February at about 11:00 LT the DCP reached “touch down” within the tolerances of its required theoretical position. Again great Team-Effort for all involved parties.!!