Project: Construction of a gas pipeline through the Strait of Magellan in Southern Argentina

Royal Boskalis Westminster N.V. and Allseas Group S.A. have been appointed for the construction of a gas pipeline through the Strait of Magellan in Southern Argentina
The work consists of laying a new 24-inch undersea gas pipeline joining Cape Espiritu Santo and Cape Virgenes in waters outside the eastern mouth of the Strait of Magellan, Argentina.
The length of the undersea pipeline and shoreline sections is approximately 38 kilometers. The
water depth (70 meters), strong currents and high tidal conditions create a challenging operating environment. The pipeline is of significant strategic importance linking the gas fields in the south with the main gas network of Argentina.we

« Terug naar het projectenoverzicht

Geovisie projects Klik om uit te vergroten
The TSHD "Prins der Nederlanden" is being mobilized for the job in the most southern city in the world.
Klik om uit te vergroten
Using some local found rebar a GPS reference station is setup. We were able to receive the signal on the other site of the magellan strait
Klik om uit te vergroten
Crew of the survey vessel BG-Tiger
Geovisie :: Kolk 7 :: 4241TH :: Arkel :: T (0183) 623239 info@geovisie.nl